|
Last Modified: 11-29-2007 |
1.6 A |
|
Service Category: Engine/Hybrid System |
Section: Engine Control |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM000003213007X |
|
Title: 3UR-FE ENGINE CONTROL: CAMSHAFT OIL CONTROL VALVE: INSTALLATION (2008 Sequoia) |
INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)
(a) Install a new O-ring to the oil control valve.
(b) Apply a light coat of engine oil to the O-ring.
(c) Install the oil control valve with the bolt.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
(d) Connect the oil control valve connector.
2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)
(a) Install a new O-ring to the oil control valve.
(b) Apply a light coat of engine oil to the O-ring.
(c) Install the oil control valve with the bolt.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
(d) Connect the oil control valve connector.
3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)
(a) Install a new O-ring to the oil control valve.
(b) Apply a light coat of engine oil to the O-ring.
(c) Install the oil control valve with the bolt.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
(d) Connect the oil control valve connector.
4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)
(a) Install a new O-ring to the oil control valve.
(b) Apply a light coat of engine oil to the O-ring.
(c) Install the oil control valve with the bolt.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
(d) Connect the oil control valve connector.
5. INSTALL AIR CLEANER HOSE ASSEMBLY
6. INSTALL V-BANK COVER SUB-ASSEMBLY
|